Nigerian President Bola Tinubu led a groundbreaking ceremony on November 13 for the multi-billion-dollar Bakassi Deep Seaport in Nigeria’s Cross River State that would become a leading hub for the blue economy. The long delayed project would cost some $3.5 billion and would be among the largest seaports in West Africa. It will relieve the pressure on Lagos port, the country’s only deepsea port.

Speaking for the Nigerian President, Vice President Kashim Shettima, stated categorically that he was not there to cut a ribbon and dance Ekpe masquerade” but to “break ground and break a centuries-old jinx.

“Many people believed this port would never happen. They said it would be a pipe dream. They said Bakassi would only be remembered for what we lost. Today, we answer them with a shovel, with concrete, with steel, and with hope, a renewed hope that a dream deferred can become a dream actualized,” he added.

President Tinubu asserted that the groundbreaking broke a centuries-long jinx, and is a revival of a long-dormant project first envisioned during the colonial era and re-engineered in 2014, with its Environmental and Social Impact Assessment (ESIA) completed by March 2015.The African Export-Import Bank (Afreximbank) is the primary financier of the project and will be organized as a Public-Private Partnership (PPP) regulated by the Infrastructure Concession Regulatory Commission (ICRC). With a planned depth of 16 meters it will be able to accommodate some of the largest cargo ships handling containers, bulk cargo, vehicles, and petroleum products. The project includes a 275-kilometer, six-lane superhighway (Calabar–Ogoja–Gakem) and an adjacent Free Trade Zone and the 7,000-hectare Bakassi Industrial Park.